Design. Build. Test. A statewide bridge-building competition for New Jersey high school students.
Develop a truss that balances strength, weight, and efficiency — working within a $1500 GSTC materials budget.
Construct the bridge from basswood and CA glue, according to the official specifications.
Build it on competition day and see how it performs under load — tested to failure or up to a 200 lb maximum.
Form a two-person team and sign up free before March 5, 2027.
Plan your truss, then purchase materials and build on-site on competition day.
Hand in your finished bridge along with your load prediction worksheet.
Your bridge is loaded to failure (or 200 lbs) and scored on strength, structural efficiency, cost efficiency, load prediction, and aesthetics.
Winners are announced across five scoring categories — with dinner for everyone.
This isn’t a paper test. It’s a real structural design problem with real materials, real loads, and real consequences — the way engineers actually learn.
Entry is completely free for teams that register by the deadline — $10 per team afterward. Competition day: March 20, 2027.
Everything you need to know about the event.
One of the most important considerations in civil engineering is cost. Engineers must design with efficiency in mind, since both overbuilding and underbuilding can create problems. In this competition, each team receives an initial budget of $1500 GSTC (Garden State Truss Currency) to purchase materials and tools.
Material prices increase by ~130% once building begins, and there are bulk discounts available on basswood strips. Teams have exactly 20 minutes to make purchasing decisions before the “while building” pricing takes effect. Unused budget remaining at the end contributes to the team’s final score.
For the full price list of every available material (basswood strips and sheets in all sizes, CA adhesive, string, painter’s tape, sandpaper, binder clips, rulers, pencils, knives, mats, and more — including free items), please refer to the Materials & Pricing section in the Resources menu.
Volunteers and organizers arrive to set up the venue, prepare materials, arrange testing stations, and distribute team workspaces. The materials marketplace is stocked and the bank is opened.
Teams begin arriving for check-in. Each team receives their workspace assignment, budget envelope ($1500 GSTC), and a submission worksheet. Consent forms are collected and verified.
Introduction of guests including the principal, school leadership, or other dignitaries. A formal kickoff frames the competition for students and parents in attendance, followed by a brief overview of the day’s events, rules, and safety guidelines. Teams set up at their assigned stations.
The build phase opens with a 20-minute Design Phase where teams plan their bridge and purchase materials at “before building” prices. Once 20 minutes elapse, “while building” pricing (approximately 130% of before-building cost) takes effect. Teams construct their bridges using only purchased basswood, CA glue, and approved tools.
Build phase ends. All teams submit their worksheets (estimated load, predicted failure mode, bridge description). A free dinner is served to all competitors, staff, and volunteers. A group photo is taken and a small show or activity runs during the break. Judges evaluate bridges and record remaining budgets.
Teams are called up in random order for load testing. Each bridge is loaded using a bucket-and-sand system (or equivalent incremental method) until failure (2″ maximum vertical deflection or structural member/joint failure) or until the load reaches 200 lbs. Each test takes approximately 3–7 minutes. Safety glasses are required during all testing.
Final scores are tallied. Winners are announced across all categories — Overall Placement (1st, 2nd, 3rd) and Special Category Awards (Highest Strength, Structural Efficiency, Cost Efficiency, Best Aesthetics, Best Load Prediction). Prizes, certificates, and trophies are awarded. An after-competition Q&A session is held.
Volunteers and organizers clean up the venue. All borrowed tools and materials are returned. The competition officially concludes.
* Schedule between events is flexible and may vary depending on competition progression.
| Category | What it measures | Max |
|---|---|---|
| SS — Strength Score | Maximum load the bridge supports before failure. Rises quickly at lower loads then levels off due to diminishing returns. | 20 pts |
| SE — Structural Efficiency | Ratio of load carried to bridge weight. Lower bridge weight has a stronger effect on increasing the score than increasing load. | 20 pts |
| CE — Cost Efficiency | Performance vs. cost. Cheaper builds score higher when they achieve similar strength. Rewards budget management. | 20 pts |
| LPS — Load Prediction Score | How close your predicted load is to actual. Symmetric — over-predicting by 50 lbs hurts as much as under-predicting by 50 lbs. | 20 pts |
| AS — Aesthetic Score | Four subcategories (0-5 each): Craftsmanship, Design Intention, Symmetry & Balance, Overall Visual Impression. | 20 pts |
The best strategy is to balance performance across all five categories rather than overemphasizing any single one.
In the event of a tie in total overall score, rankings are determined in this order:
If a tie remains, teams will be declared co-winners for Overall Placement Awards.
Given to the teams with the highest total scores across all five categories. Prizes listed per team — with 2 members, each contestant takes home a meaningful share.
Beyond the overall podium, two additional category awards recognize outstanding bridges in specific dimensions of design.
Every team that competes walks away with something. All participating teams that have not earned an award above will receive a certificate recognizing their completion of the competition.
Official rules, specifications, and the full contestant handbook.
In this competition, teams will design and build a bridge using basswood. The event is intended to test a range of skills, including technical design, efficiency, cost management, accuracy of predictions, and the ability to work within time and size constraints.
Each team will be given a budget of $1500 GSTC to “purchase” materials for their bridge design. This introduces an additional layer of strategy, as teams must balance structural performance with material cost and efficiency.
At the end of the competition, bridges will be load tested until failure to determine their maximum load capacity. This value makes up a significant portion of the total score.
The construction phase runs from 2:30 PM to 5:30 PM and is divided into two parts:
Once materials are purchased, they are considered final and may not be refunded or exchanged (except for defective materials approved by judges).
Teams will be called up in random order for testing. Each test takes approximately 3-7 minutes per bridge.
Each team receives a worksheet to complete during the competition. It must be filled out before the end of the building phase:
After submission, teams may leave for dinner while judges evaluate bridges, record remaining budget, and complete scoring. No modifications may be made after the building period ends.
All dimensions measured at the widest, tallest, and longest points of the bridge. No maximum weight is specified.
A 3″ x 3″ x 3″ clearance cube must be able to pass through the full length of the bridge without obstruction. A continuous roadway deck is not required, but the center of the span must provide a stable load-bearing surface.
The bridge must rest only on the provided supports at each end. No abutments, anchors, or additional support structures may be used. The contact must be purely vertical — the bridge may not exert horizontal forces on the supports beyond friction.
Allowed: Cut/notched to any angle, sanded, bent using water only, marked with pencils/pens, decorated with colored pencils/markers.
Not Allowed: Soaked/coated/treated with anything other than water, impregnated/reinforced/hardened using adhesives or external substances beyond normal joint bonding.
Each team receives $1500 GSTC (Garden State Truss Currency) to purchase materials. The currency used is not real money. All listed materials are optional to purchase and use in the construction of the bridge.
The “While Building” cost is approximately 130% of the “Before Building” cost, reflecting the increased expense of in-competition purchasing. There is also up to a 15% bulk discount on basswood strips, allowing teams to purchase 30 strips (instead of 10) at a cheaper per-strip price. However, teams must determine if they are willing to commit to buying in bulk and are encouraged to plan ahead.
Teams will have exactly 20 minutes to make purchasing decisions before the while-building pricing takes effect. If a team has not placed any material orders after 20 minutes, the pricing will automatically switch to during-building pricing regardless of design progress.
All structural materials available for purchase. Prices are listed in GSTC. 30-strip options offer a bulk discount compared to the 10-strip equivalents.
| Material | Before Building | While Building | Notes |
|---|---|---|---|
| 10 Basswood Strips (1/16″ x 1/16″ x 12″) | $35 | $45 | Smallest size, lowest MOI |
| 30 Basswood Strips (1/16″ x 1/16″ x 12″) | $90 | $120 | Bulk discount |
| 10 Basswood Strips (1/8″ x 1/8″ x 12″) | $90 | $120 | Medium size |
| 30 Basswood Strips (1/8″ x 1/8″ x 12″) | $230 | $300 | Bulk discount |
| 10 Basswood Strips (1/8″ x 1/4″ x 12″) | $170 | $220 | Largest size, highest MOI |
| 30 Basswood Strips (1/8″ x 1/4″ x 12″) | $435 | $565 | Bulk discount |
| 1 Basswood Sheet (1/8″ x 3″ x 3″) | $200 | $260 | Gusset plates only, max 1/8″x1/2″x1/2″ |
| CA Adhesive (1 bottle) | $80 | $100 | Primary adhesive for bonding |
| String/Twine (5’ length) | $30 | $40 | Tension element only |
Tools used during construction must not be part of the final bridge. All listed tools are optional to purchase and use to assist in bridge construction.
| Tool | Before Building | While Building | Notes |
|---|---|---|---|
| Painter’s Tape (5’ in length) | $20 | $25 | Painter’s tape may be used only for temporary alignment and assembly. It may not be structural, and must be fully removed before testing. Since painter’s tape is usually less effective than binder clips, it is marked at a lower price than the binder clips. |
| Sandpaper (2 sheets) | $15 | $20 | Sandpaper may be used to smooth, shape, or adjust basswood members before assembly. It may not be used to act as structural reinforcement for the bridge. |
| Small Binder Clips (10 clips) | $45 | $60 | Small binder clips may be used only as temporary clamping aids during assembly to hold joints while glue dries. They may not remain attached to the bridge during testing, and may not serve any structural or load-bearing purpose. |
The following tools and materials will be provided to all teams free of charge for use during construction. Items marked with an asterisk (*) are available upon request and may require approval/supervision from judges, as they are not commonly used or may have restricted usage depending on the situation.
Basswood strips may be physically altered in the following ways:
The sticks must NOT be altered in the following ways:
At any point during the competition, teams may exchange larger bills for smaller ones or combine smaller bills into larger ones. This is the only function of the competition bank. The bank does not provide any additional services, such as loans, investments, interest, or taxes. It is strictly used for changing bill denominations.
For example, a team may exchange one $100 GSTC bill for five $20 GSTC bills if needed to purchase smaller items at the Materials Marketplace.
Penalties are determined by judges based on severity, with final authority resting with them. All penalties are deducted from the final score.
Given for minor issues or small rule deviations that must be corrected. Teams may be asked to adjust their bridge. Most teams will receive a warning before any penalty.
Applies to more serious rule breaches affecting fairness or structural integrity. 15% deduction from final score.
Severe violations: interfering with other teams, intentional rule exploitation, fundamentally invalid construction, or dangerous safety breaches.
All competitors must submit a signed consent form acknowledging liability, the code of conduct, and related competition policies. If a competitor is under 18 years old on March 20, 2027, a parent or guardian signature is also required.
The competition will be professionally filmed and photographed. Each bridge will be photographed and uploaded to the website. To consent to being included in photos or videos, you must complete the required waiver forms.
External references, prior designs, or pre-made structural templates are not permitted during construction or testing. Personal electronic devices may only be used for basic utility functions (timekeeping, simple calculations). Devices may not be used to search for bridge designs, construction methods, or engineering guidance.
Teams are encouraged to research and prepare a design strategy before competition day.
The Garden State Truss Bridge Competition — who we are, where we came from, and the team behind the event.
The 2027 New Jersey GST Bridge Competition stands for the Garden State Truss Bridge Competition, a statewide structural engineering competition created for New Jersey high school students.
Led by Ryan Li, our team is made up of college students from different universities who came together because of a shared interest in STEM outreach, engineering, and creating meaningful academic competitions for students across New Jersey.
Our team, previously seniors in high school, founded and hosted the 2026 New Jersey Statewide High School Integration Bee at Raritan Valley Community College, which brought together students from across the state for a fast-paced calculus competition and was a tremendous success. Click here if you want to learn more!
Building on that momentum, GST was inspired by a bridge-building competition first organized by Ryan at Bridgewater-Raritan High School in September 2025. After seeing how much excitement a hands-on engineering event could create, we realized there still wasn’t a dedicated statewide bridge competition in New Jersey focused on wood structural design.
So we decided to build one.
Our goal is to create a competition where students can design, build, and test basswood truss bridges in a true head-to-head setting while also connecting with students from across the state who share the same interest in engineering.
This is only the start. We hope GST becomes the first of many statewide STEM competitions and helps build a stronger tradition of student-led academic events in New Jersey.
Event Director / Host
Student at the University of Illinois Urbana-Champaign
Ryan founded the Mu Alpha Theta Math Honor Society at BRHS in February 2025, where he helped organize several academic events, including the 2025 Integration Bee and a popsicle stick bridge competition. Both events had strong student participation and good engagement.
In 2026, Ryan expanded these efforts beyond the club structure by organizing the NJ Statewide Integration Bee in collaboration with Raritan Valley Community College and faculty members. The event brought together students from seven schools, with over 40 participants and contributors and around 20 competitors, significantly increasing its scale.
Building on these experiences, Ryan developed the 2027 NJ GST Bridge Competition. Unlike earlier Integration Bee events focused mainly on calculus-based problem solving, this competition is designed to be more accessible to a wider range of high school students. It builds on earlier bridge-building initiatives with the goal of creating a larger, more inclusive statewide engineering event that promotes hands-on learning in structural design, teamwork, and problem-solving.
At UIUC, he plans to study civil engineering and further develop his knowledge in structural engineering, with an interest in transportation engineering as a potential minor.
Thank you to everyone helping make this event possible and contributing their time and effort to its planning and organization. Contributors’ names are listed in alphabetical order.
April 8–10, 2025
The inaugural BRHS Integration Bee took place at Bridgewater-Raritan High School over three days. Calculus students from across the region competed in a fast-paced integration challenge, building friendships and sharpening their mathematical skills. It set the foundation for future events.
September 29, 2025
As a stepping stone between the Integration Bee and the GST Bridge Competition, we ran a popsicle stick bridge competition at BRHS. Teams designed and built popsicle-stick bridges that were then load-tested for fun and prizes. It was a great low-stakes way to test our bridge-competition model in front of a live audience before scaling up.
Tuesday, March 10, 2026 · 5:00 PM – 8:30 PM EST
The Integration Bee went statewide. Held at the Whitman Science Center at Raritan Valley Community College (RVCC), the event was open to all NJ high school students with an interest in calculus, and was completely free to attend. The format stays true to its roots: a fast-paced, individual integration showdown for serious students of calculus. Learn more at njintegrationbee.org.
The 2027 NJ GST Bridge Competition is completely free for all students — there are no registration fees, material fees, or participation costs. This is made possible through the generous sponsorship from multiple companies, as well as the support and contributions of event organizers and volunteers.
By sponsoring, you help make engineering education accessible to high school students across New Jersey and inspire the next generation of engineers.
If you or your company would like to support the competition, there are several ways to contribute:
Help fund prizes, materials, food, and venue costs. Any amount makes a difference!
Universities can host the event, provide judges, or connect students with engineering programs.
Donate basswood, tools, or other construction materials used during the competition.
Sponsor a specific award category or contribute to the prize pool.
Interested in supporting? Please contact us at njgst2027@gmail.com for sponsorship opportunities. We’d love to discuss how you can help make this event a success!
The 2027 NJ GST Bridge Competition takes place on March 20, 2027. Images and videos from the event will be populated here after the competition itself.
Check back after competition day to see photos of bridges, teams, the awards ceremony, and more!
All images are used in accordance with their respective licenses.
Sign up to compete in the 2027 NJ GST Bridge Competition.
Questions about registration, sponsorship, or volunteering? We’re here to help and aim to respond within 48 hours.
Whether you’re a student, parent, teacher, or potential sponsor — we’d love to hear from you.